Our step
1957
| Late Masao Kasai establishes Suzuki Seisakusho in Nakamura-ku, Nagoya-shi and begins the assembling production of automotive electric equipment parts.
| |
I change it to the corporation from the private enterprise and become Suzuki Seisakusho.
| ||
I install a new factory in the present location and move from Nagoya-shi.
| ||
I build the assembly plant in the adjoining land to plan the expansion of duties.
| ||
I found press working and a cutting section, and the in-house production of parts begins becoming it and plans expansion of the ordering.
| ||
I change a corporation organization and assume a company Kasai mill.
| ||
I found an electric wire processing section and begin production of the wire harness.
| ||
I found kokikojo and begin a design, the production of chikogu, a die, the labor saving machine.
| ||
I receive commendation as a rationalization excellence factory from Aichi.
| ||
I build the factory specialized in electric wire processing in Tarui-cho, Fuwa-gun, Gifu and, with the introduction of the new star plane, plan production expansion of the wire harness.
| ||
1981
| I install a plastic molded factory for the industry in the Ichinomiya-shi, Aichi Danyang town and begin the production of automotive switch parts.
| |
1983
| I get PM excellence business ground prize from association of Japan plant maintenance in '83.
| |
1984
| I build the Ko Minami ground as a factory specialized in assembling in the adjoining land to plan the expansion of the production model and begin production.
| |
1986
| I build the assembly plant in a Tarui-cho, Fuwa-gun, Gifu Eicho place and begin production to plan the reinforcement of the assembling scale.
| |
Production factories are built more by Tarui factory to plan the reinforcement of the wire ring harness and switch assembling product supply.
| ||
I build the new factory in Tanyochodosaki, Ichinomiya-shi, Aichi and become our parts production base commencing with production with an existing molding factory to plan the production expansion of press working parts.
| ||
I build a new molding factory and the assembly plant in existing Ichinomiya factory to cope with the production of switch of the new field and switches increase for foreign countries.
| ||
I establish Nagano factory in Komagane-shi, Nagano, and, commencing with the production sale of the automatic assembling machine labor saving apparatus, a base of the automation apparatus production measures becoming it.
| ||
I build this company building (4F) headquarters factory (3F) and plan expansion of the business.
| ||
I let seigibu become independent from the Engineering Department to plan the reinforcement of the production preparations section.
| ||
2000
| It is the certification acquisition ISO9002-1994.
| |
I establish Hirashima factory as the reinforcement correspondence of molding parts.
| ||
I establish Kasugai factory as the reinforcement correspondence of molding parts.
| ||
I establish joint venture JKC in Toronto of Canada.
| ||
I establish a Technical Development Department as a new organization.
| ||
It is the certification acquisition ISO9001-2000.
| ||
I change Plant name in Canada to Kasai Canada Inc.
| ||
I move, and Nagano factory is built by the order favorable condition of the labor saving apparatus
| ||
I let labor saving apparatus Division (Nagano factory) become independent and start as new company "Kasai techno".
| ||
Chiaki factory is founded for securing of ability by production amount increase
| ||
The ISO14001 (the environmental management system) certification acquisition
| ||
I carry out an organization review, large slimming for capacity for organization improvement
| ||
2010
| January
September
| For the concentration of financial resources, I plan the unification of an organization, the base.
The unification of an organization, the base is completed and renovates the management system.
|
2011
| August
| For the purpose of the improvement of the procurement function, I establish a procurement department.
|
October
| For the purpose of reinforcement of TPS, I establish an improvement room.
| |
December
| ISO14001 (the environmental management system) certification reaccession.
| |
2013
| June
| For the purpose of overseas base establishment, I establish a new section.
|
2014
| March
| I establish local corporation "Kasai Advanced MFG. Philippines Inc." in the Philippines.
|
2015 | February
| The KAMP(Kasai Advanced MFG. Philippines Inc.) factory completion.
|
April
| It is extension and/or alteration for the head office north factory, correspondence of the production increase.
| |
2016
| March
| KAMP(Kasai Advanced MFG. Philippines Inc.) factory operation.
|
2017
| March
| It is the certification acquisition KAMP(Kasai Advanced MFG. Philippines Inc.) ISO9001-2015
|