Our step
1957 | Late Masao Kasai establishes Suzuki Seisakusho in Nakamura-ku, Nagoya-shi and begins the assembling production of automotive electric equipment parts. | |
I change it to the corporation from the private enterprise and become Suzuki Seisakusho. | ||
I install a new factory in the present location and move from Nagoya-shi. | ||
I build the assembly plant in the adjoining land to plan the expansion of duties. | ||
I found press working and a cutting section, and the in-house production of parts begins becoming it and plans expansion of the ordering. | ||
I change a corporation organization and assume a company Kasai laboratory. | ||
I found an electric wire processing section and begin production of the wire harness. | ||
I found kokikojo and begin a design, the production of chikogu, a die, the labor saving machine. | ||
I receive commendation from Aichi as a rationalization excellence factory. | ||
I build the factory specialized in electric wire processing in Tarui-cho, Fuwa-gun, Gifu and, with the introduction of the new star plane, plan production expansion of the wire harness. | ||
1981 | I install a plastic molded factory for the industry in the Ichinomiya-shi, Aichi Danyang town and begin the production of automotive switch parts. | |
1983 | I get PM excellence business ground prize from association of Japan plant maintenance in '83. | |
1984 | I build the Ko Minami ground as a factory specialized in assembling in the adjoining land to plan the expansion of the production model and begin production. | |
1986 | I build the assembly plant in a Tarui-cho, Fuwa-gun, Gifu Eicho place and begin production to plan the reinforcement of the assembling scale. | |
Production factories are built more by Tarui factory to plan the reinforcement of the wire ring harness and switch assembling product supply. | ||
I build the new factory in Tanyochodosaki, Ichinomiya-shi, Aichi and become our parts production base commencing with production with an existing molding factory to plan the production expansion of press working parts. | ||
I build a new molding factory and the assembly plant in existing Ichinomiya factory to cope with the production of switch of the new field and switches increase for foreign countries. | ||
I establish Nagano factory in Komagane-shi, Nagano, and, commencing with the production and sales of the automatic assembling machine labor saving apparatus, a base of the automation apparatus production measures becoming it. | ||
I build this company building (4F) headquarters factory (3F) and plan expansion of the business. | ||
2000 | It is the certification acquisition ISO9002-1994. | |
I establish Hirashima factory as the reinforcement correspondence of molding parts. | ||
I establish Kasugai factory as the reinforcement correspondence of molding parts. | ||
I establish joint venture JKC in Toronto in Canada. | ||
I establish a Technical Development Department as a new organization. | ||
It is the certification acquisition ISO9001-2000. | ||
I change Plant name in Canada to Kasai Canada Inc. | ||
I move, and Nagano factory is built by the order favorable condition of the labor saving apparatus | ||
I let labor saving apparatus Division (Nagano factory) become independent and start as new company "Kasai techno". | ||
Chiaki factory is founded for securing of ability by production amount increase | ||
The ISO14001 (the environmental management system) certification acquisition | ||
2010 | January
September | For the concentration of financial resources, I plan the unification of an organization, the base.
The unification of an organization, the base is completed and renovates the management system. |
2011 | August | For the purpose of the improvement of the procurement function, I establish a procurement department. |
October | For the purpose of reinforcement of TPS, I establish an improvement room. | |
December | ISO14001 (the environmental management system) certification reaccession. | |
2014 | March | I establish local corporation "Kasai Advanced MFG. Philippines Inc." in the Philippines. |
2015 | February | The KAMP(Kasai Advanced MFG. Philippines Inc.) factory completion. |
April | It is extension and/or alteration for the head office north factory, correspondence of the production increase. | |
2016 | March | KAMP(Kasai Advanced MFG. Philippines Inc.) factory operation. |
2017 | March | It is the certification acquisition KAMP(Kasai Advanced MFG. Philippines Inc.) ISO9001-2015 |
2024 | March | I hold a ceremony of the tenth anniversary of the establishment in Philippine local corporation "KAMP" |